PROJECT DETAILS
Schwab unloaded, moved in, and placed a 180,000 pound (90 ton) header into a concrete pit for this industrial manufacturer.








Schwab unloaded, moved in, and placed a 180,000 pound (90 ton) header into a concrete pit for this industrial manufacturer.
CONTRACTOR
Schwab
PROJECT CATEGORY
Industrial Construction